Logistics 13.01.2021

Logistics at the heart of the BOUCHÉ Group’s development

Logistics at the heart of the BOUCHÉ Group’s development

2021: Construction of a 12,000m² hall

As good news never comes alone, Bouché Logistique has also acquired a plot of land of more than 2 hectares for an additional 12,000m² hall along the motorway. Like our other buildings, this one will be equipped with an automatic sprinkler system and will meet APSAD – ICPE – 1510 – 2662 – 2663 standards.

These various projects will enable our logistics activity to reach a total of 30,000m² of storage space.

Since September 2020, a 6,500m² storage hall

The development of Bouché Logistique is at the heart of our concerns and we are delighted to see the new 6,500m² storage hall operational since September 2020.

This new warehouse is accompanied by new offices as well as a total reorganisation of the site with a new state-of-the-art washing station for heavy goods vehicles, respectful of the environment (by recovery of rainwater). This will be open to all, refrigerators, tautliners, tippers, coaches, tankers, etc., for external washing, starting from the chassis to the roof.